An Optimisation Process to Motivate Effective Adoption of BIM for Refurbishment of Complex Buildings in New Zealand

aut.relation.endpage661
aut.relation.issue4
aut.relation.journalFrontiers of Architectural Research
aut.relation.startpage646
aut.relation.volume8
dc.contributor.authorOkakpu, Anthony
dc.contributor.authorGhaffarianHoseini, Ali
dc.contributor.authorTookey, John
dc.contributor.authorHaar, Jarrod
dc.contributor.authorGhaffarianHoseini, Amirhosein
dc.date.accessioned2026-10-15T03:21:39Z
dc.date.issued2019-06-23
dc.description.abstractDespite the multidisciplinary networks involved in refurbishment of complex building projects, the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture, Engineering and Construction (AEC). To this end, this study empirically examines the potential real benefits between traditional network and BIM network for a real-time refurbishment case study project, through agent-based simulation modelling. A social network analysis theory is adapted to model the project interaction networks and a BIM prototype network. An assessment of the main stakeholders for BIM perception is carried out. We offered three prototype interaction networks for comparison of real BIM benefit. An agent-based Bayesian network model is used to simulate the propagation of design error within the project networks. The result of the analysis show that BIM project diffuses error efficiently, while stakeholders recovers faster and nearly at the same time than traditional network. The optimised network shows better performance to the traditional network, when there is early involvement of subcontractors. The main contribution of this study is providing a novel approach to compare real benefits for traditional method to BIM method for refurbishment project and to provide avenue for project stakeholders to optimise their interaction through adoption of BIM.
dc.identifier.citationFrontiers of Architectural Research, ISSN: 2095-2635 (Print); 2095-2643 (Online), ELSEVIER, 8(4), 646-661. doi: 10.1016/j.foar.2019.06.008
dc.identifier.doi10.1016/j.foar.2019.06.008
dc.identifier.issn2095-2635
dc.identifier.issn2095-2643
dc.identifier.urihttp://hdl.handle.net/10292/22152
dc.languageEnglish
dc.publisherElsevier
dc.relation.urihttps://www.sciencedirect.com/science/article/pii/S2095263519300548
dc.rights© 2019 The Authors. Open access.
dc.rights.accessrightsOpenAccess
dc.rights.licenseAttribution-NonCommercial-NoDerivatives 4.0 International
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectArts & Humanities
dc.subjectArchitecture
dc.subjectBuilding information modelling
dc.subjectStakeholders interaction
dc.subjectOptimisation process
dc.subjectSimulation modelling
dc.subjectRefurbishment project
dc.subjectNew Zealand
dc.subjectSocial network analysis
dc.subjectChallenges
dc.subjectManagement
dc.subjectModel
dc.subject33 Built Environment and Design
dc.subject3301 Architecture
dc.subject3302 Building
dc.subject1201 Architecture
dc.subject1202 Building
dc.subject1205 Urban and Regional Planning
dc.titleAn Optimisation Process to Motivate Effective Adoption of BIM for Refurbishment of Complex Buildings in New Zealand
dc.typeJournal Article
pubs.elements-id367158

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1-s2.0-S2095263519300548-main.pdf
Size:
3.96 MB
Format:
Adobe Portable Document Format
Description:
Journal article