Risk-contingency fund in the design stage elemental cost planning function: a theoretical exploration

aut.conference.typePaper Published in Proceedings
aut.researcherRotimi, James Olabode Bamidele
dc.contributor.authorAdafin, J
dc.contributor.authorWilkinson, S
dc.contributor.authorRotimi, J.O.B.
dc.contributor.editorYiu, TW
dc.contributor.editorGonzales, V
dc.date.accessioned2013-11-28T22:52:46Z
dc.date.available2013-11-28T22:52:46Z
dc.date.copyright2013
dc.date.issued2013
dc.description.abstractEffectiveness of contingency fund management can strongly influence project success as contingency is proportional to the risk present in a project. However, the traditional allocation of a contingency fund in construction projects using lump sum or percentage addition method to cover risks in elemental cost plans and tenders has been challenged and criticized leading to the evolution of analytical and scientific methods. Therefore, the purpose of this study is to signify design stage elemental cost planning as a function of risk-contingency fund. The work presented in this paper is a literature-based theoretical exploration, and a preliminary stage of an on-going doctoral research on the budgetary reliability of design stage elemental cost plan. As a first step, a detailed review of related literature was made to establish the risks inherent in preparing the design stage elemental cost plan. Secondly, various contingency fund estimation methods available for application in construction practice were identified by demonstrating the theoretical context. The insights gained from the foregoing steps then helped in devising theoretical concepts for securing elemental cost plan as a reliable budgetary tool for construction projects through risk-contingency analysis that guarantees cost certainty.
dc.identifier.citationThe 38th Australasian Universities Building Education Association Conference held at The University of Auckland, Auckland, New Zealand, 2013-11-20 to 2013-11-22
dc.identifier.urihttps://hdl.handle.net/10292/6032
dc.publisherAustralasian Universities Building Education Association (AUBEA)
dc.relation.urihttp://www.aubea2013.org.nz/wp-content/uploads/Final-for-handbook-and-website-31Oct.pdf
dc.rightsNOTICE: this is the author’s version of a work that was accepted for publication. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in (see Citation).
dc.rights.accessrightsOpenAccess
dc.subjectBudgetary reliability
dc.subject, Construction projects
dc.subjectElemental cost plan
dc.subjectProject success
dc.subjectRisk-contingency fund
dc.titleRisk-contingency fund in the design stage elemental cost planning function: a theoretical exploration
dc.typeConference Contribution
pubs.elements-id149024
pubs.organisational-data/AUT
pubs.organisational-data/AUT/Design & Creative Technologies
pubs.organisational-data/AUT/Design & Creative Technologies/School of Engineering
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
46530final00128.pdf
Size:
338.62 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
licence.htm
Size:
30.34 KB
Format:
Unknown data format
Description: