Simulation of bridge construction works: an exploratory study in New Zealand

aut.relation.endpage710
aut.relation.pages6
aut.relation.startpage705
aut.researcherRotimi, James Olabode Bamidele
dc.contributor.authorZaeri, F
dc.contributor.authorRotimi, JOB
dc.contributor.editorChantawarangul, K
dc.contributor.editorSuanpaga, W
dc.contributor.editorYazdani, S
dc.contributor.editorVimonsatit, V
dc.contributor.editorSingh, A
dc.date.accessioned2016-01-26T00:33:44Z
dc.date.available2016-01-26T00:33:44Z
dc.date.copyright2014
dc.date.issued2014
dc.description.abstractBridge construction projects are associated with uncertainties partly due to sequencing issues, logistics, interactions, and resource constraints. Their construction is mostly cyclic and repetitive, yet complex, requiring innovative approaches to cope with its management. Construction projects planners seek methods to enable them to schedule bridge construction projects in consideration of these constraining factors. The main objective of this research is to develop a concept of a simulation-based modeling approach. It aimed to decide which data in real systems are important for the modeling of an operation, and in which way they must be gathered to help planners approach a proper simulation-based schedule. A case study project based in New Zealand was selected for this paper. It focuses on developing a resource-based model of bridge construction using a launching-girder construction method, taking into account the complex interactions among the project’s components. The discrete elements within the project and steps taken to develop a model are described in this paper. The study enhances knowledge on the applicability of simulation in repetitive construction operation, which in turn can provide more realistic models for scheduling progress.
dc.identifier.citationThe Second Australasia and South-East Asia (ASEA-SEC-2) on Sustainable solutions in structural engineering and construction held at Rama Gardens Hotel, Bangkok, Thailand., Bangkok, Thailand, 2014-11-03to 2014-11-07, pp.705 - 710 (6)
dc.identifier.doi10.14455/ISEC.res.2014.98
dc.identifier.isbn978-0-9960437-0-0
dc.identifier.urihttps://hdl.handle.net/10292/9420
dc.publisherIsec Press
dc.rightsThis book, or parts thereof, may not be reproduced in any form or by any means electronic or mechanical, including photocopying, recording or any information storage and retrieval system now known or to be invented, without written permission from the Publisher, unless available in open access.
dc.rights.accessrightsOpenAccess
dc.subjectSimulation; Repetitive; Complexity; Interdependency; Scheduling; Bridge construction
dc.titleSimulation of bridge construction works: an exploratory study in New Zealand
dc.typeConference Contribution
pubs.elements-id159473
pubs.organisational-data/AUT
pubs.organisational-data/AUT/Design & Creative Technologies
pubs.organisational-data/AUT/Design & Creative Technologies/School of Engineering
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
DigitalFile_94035.pdf
Size:
160.39 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
RE4.10 Grant of Licence.docx
Size:
14.05 KB
Format:
Microsoft Word 2007+
Description: