Managing the risks associated with scope changes in Guaranteed Maximum Price (GMP) contracts

aut.conference.typePaper Published in Proceedings
dc.contributor.authorRotimi, J.O.B.
dc.contributor.authorSmith, L
dc.contributor.authorOgunsemi, DJ
dc.date.accessioned2013-11-05T20:22:28Z
dc.date.available2013-11-05T20:22:28Z
dc.date.copyright2009
dc.date.issued2009
dc.description.abstractPurpose This study’s objective was to determine if prior definition of scope changes within contract clauses would be an effective form of risk management on GMP projects. Design The study evaluates a typical project executed under the GMP contract system in New Zealand. Information on the administration of the project was obtained from project documents; and consequently questionnaires administered to the key project participants. The questions produced both qualitative and quantitative data that formed the basis for suggested solution to managing risks on GMP projects. Findings Experiences gained on the case study project show that the performance of GMP contracts could be improved through clarity of the project scope prior to awards, and partly on the procedural arrangements that are in place for dealing with subsequent scope changes. However these are not panaceas to risk mitigation on GMP projects, but a commonality of objectives by project management and the supply chain to make it work. Value The study provides further insight into the applicability of GMP contracts and how scope changes during project design developments could be managed on construction projects.
dc.identifier.citationPublished in: Proceedings of the Fourth Built Environment Conference (ASOCSA 2009).
dc.identifier.roid13515en_NZ
dc.identifier.urihttps://hdl.handle.net/10292/5803
dc.publisherThe Association of Schools of Construction of Southern Africa (ASOCSA)
dc.rightsNOTICE: this is the author’s version of a work that was accepted for publication. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in (see Citation).
dc.rights.accessrightsOpenAccess
dc.subjectGMP
dc.subjectDesign development
dc.subjectScope change
dc.subjectRisk management
dc.titleManaging the risks associated with scope changes in Guaranteed Maximum Price (GMP) contracts
dc.typeConference Contribution
pubs.elements-id6448
pubs.organisational-data/AUT
pubs.organisational-data/AUT/Design & Creative Technologies
pubs.organisational-data/AUT/Design & Creative Technologies/School of Engineering
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
ASOCSA PAPER (Final Submitted II).pdf
Size:
48.13 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
licence.htm
Size:
30.34 KB
Format:
Unknown data format
Description: