Construction payment delays and losses: perceptions of New Zealand

aut.conference.typePaper Published in Proceedings
aut.researcherRotimi, James Olabode Bamidele
dc.contributor.authorRamachandra, T
dc.contributor.authorRotimi, J.O.B.
dc.date.accessioned2013-11-05T20:30:05Z
dc.date.available2013-11-05T20:30:05Z
dc.date.copyright2012
dc.date.issued2012
dc.description.abstractPayment delays and losses are not a new phenomenon in the construction industry. Both of these combine to elevate the operational risks of construction businesses. In spite of new provisions in the Construction Contracts Act (CCA), New Zealand, construction businesses are still not immune to payment delays and losses. This study investigates the extent of the payment problem and possible solutions that could mitigate payment risks on construction projects. An online questionnaire survey was administered to contractors, subcontractors and consultants for their opinions on the issue. The study found that payment delays and losses are experienced by contractors (10-40%) and subcontractors (10-80%) on the total projects undertaken by them since the CCA implementation. Retention sums are very often delayed while final and interim payments are delayed less than often. Contractors and subcontractors indicated that payment bonds, direct payments and the use of trust accounts were preferred solutions to the payment problems experienced by industry.
dc.identifier.citationProceedings PMI New Zealand Chapter 18th Annual Conference 2012: Concise Paper.
dc.identifier.urihttps://hdl.handle.net/10292/5812
dc.publisherProject Management Institute (PMI) New Zealand Chapter
dc.relation.urihttp://www.pmi.org.nz/pmi/conferences/wellington2012/procs/ramachandra-concise.pdf
dc.rightsCopyright © 2012 Thanuja Ramachandra and James Olabode Bamidale Rotimi. The author(s) assign to PMI New Zealand Chapter and educational non-profit institutions, a non-exclusive licence to use this document for personal use and in courses of instruction, provided that the article is used in full and this copyright statement is reproduced. The author(s) also grant a non-exclusive licence to PMI New Zealand Chapter to publish this document on the PMI New Zealand Chapter web site and in other formats for the Proceedings PMI New Zealand Chapter Wellington 2012. Any other use is prohibited without the express permission of the author(s).
dc.rights.accessrightsOpenAccess
dc.subjectPayment delays
dc.subjectLosses
dc.subjectSolutions
dc.subjectNew Zealand
dc.titleConstruction payment delays and losses: perceptions of New Zealand
dc.typeConference Contribution
pubs.elements-id104753
pubs.organisational-data/AUT
pubs.organisational-data/AUT/Design & Creative Technologies
pubs.organisational-data/AUT/Design & Creative Technologies/School of Engineering
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Rotimi_ Construction payment delays and losses_Perceptions of New Zealand_ text.pdf
Size:
177.41 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
licence.htm
Size:
30.34 KB
Format:
Unknown data format
Description: